Overall view of the brick model of the Roman way station at Ambrussum
Ambrussum Oppidum Museum · Villetelle · Participatory model

Ambrussum

The remains are a few metres away, beside the Via Domitia. The model shows the way station as it once stood — and visitors are the ones who built it.

400builders

Client
Ambrussum Museum
Sector
Museum · heritage
Location
Villetelle, France
Period
Oct 2025 → Feb 2026
Duration
2 × 2 weeks of workshops
Pieces
45,000
Area
10 m²
Built
With the public · 400 participants
The brief

Closing the gap between ruin and building.

A Roman way station today means foundations, thresholds and the first courses of walls. Visitors see a ground plan and have to rebuild the rest in their heads — something archaeologists do without thinking and the general public does not do at all.

The museum wanted an object showing the building upright, next to the remains, allowing direct comparison: here is what survives, here is what it was.

What we built

A model built by the people who come to see it.

We built the whole scene in bricks: the way station and its enclosure, the courtyards, the lodgings, the stables, the paved road with its porticoes and the arched bridge carrying it onward. Ten square metres, forty-five thousand pieces, and a palette matched to the real materials — river pebbles for the roadway, terracotta for the roofs.

But the model did not arrive finished. It was assembled on site across two school-holiday periods, in autumn and then in February, by visitors themselves, guided by our digital plans and supported by our hosts. Four hundred people laid pieces on it.

That changes the nature of the visit: you don't come to see a model, you come to see the one you helped build. Many families returned between sessions to check how far the build had got.

Group of participants around the build table during a workshop
The open workshops, during school holidays.
Participant laying pieces on the model while following a plan
Each builder works on one zone, plan in hand.
The paved road in grey bricks, lined with porticoes and tiled roofs
The paved Via Domitia and its porticoes.
Young participant checking the plan on a tablet in front of the arched brick bridge
The arched bridge, built from the digital plan.
Detail of the way station's inner courtyard with its hearth and figures
The inner courtyard and its outbuildings.
Crate of orange roof tiles and build plan on the workshop table
Forty-five thousand pieces, sorted before laying.
Overhead view of the build table: the printed plan, trays of pieces and participants' hands
The plan in the middle, the trays around it: the build table from above.
Hands reaching into a tray of beige and brown tiles and plates
Finding the right tile just before laying it. Sorting is what makes it fast.
Hands assembling a colonnade in grey bricks
A portico built column by column.
Hands assembling greenery from green bricks
The planting is built too, piece by piece.
A hand above a tray of bricks sorted by colour
Forty-five thousand pieces, sorted by colour before the workshop.
The outcome

Four hundred builders, and a model that stays on site.

Both workshop runs filled up. The finished model stayed at the museum, metres from the archaeological site it explains, and four hundred people can now point to the piece they laid themselves.

A similar project?

You have a site where only the ground plan survives.

A villa, a fort, a mill, an abbey: if your visitors have to imagine the building, a model will spare them the effort — and your workshops will do the rest.

Start a project

contact@unibrick.frAnswered within 24–48 working hours
+33 7 61 71 03 69Monday to Friday, 9am – 6pm CET
Participatory modelDesigned by us, built with your audience