
Grundfos
A piece too big for a table. You build it on the floor, in segments, and nobody sees the whole thing until it comes together.
XXLbuilt on the floor
- Client
- Grundfos
- Through
- Jolico Events (event agency)
- Sector
- Industry · events
- Location
- Grenoble, France
- Date
- 2024
- Format
- XXL collective build
- Split
- Simple segments, one per small group
- Assembly
- At the end, in front of everyone
An activity for a whole room, not four tables.
For an offsite, the agency wanted an activity that could involve everyone at once — without splitting the group into rotating workshops and without leaving half the room watching the other half work.
It also had to stay simple to explain: in a conference room you do not get twenty minutes of instructions before starting.
One piece cut into segments, built on the floor.
We designed a large build split into independent segments, each simple enough for a small group with no experience to assemble from a plan of a few pages.
It goes together on the floor, which changes the dynamic of a corporate activity: people crouch, move about, wander over to see what the next group is doing. The room moves instead of sitting.
The segments only lock together at the end. That is when you find out whether the groups kept to the dimensions — and when the assembly becomes everyone's business.

The whole room on its feet, around one piece.
The activity held the entire group in a single session, with no rotation and no dead time. The assembled piece stayed on display for the rest of the offsite.
You are running an offsite for a hundred people or more.
We also work as a direct subcontractor for event agencies, on your schedule and under your brand if you prefer.

